China shower door manufacturer for projects, wholesale, and OEM support.

Prefabricated Systems · OEM Ready

Modular Bathroom Pods Built for Fast-Paced Construction

Factory-engineered prefabricated bathroom pods that cut on-site wet trades, compress your schedule by up to 60%, and ship flat-packed to hotels, student housing, and multi-family projects worldwide.

Three-panel curved glass shower enclosure with chrome top bar and rain showerhead against marble walls, banner image
★★★★★

“Trusted by buyers from more than 190 countries since 1999.”

60-85% Less On-Site Installation Time
8mm Tempered Safety Glass, EN12150
72h Salt-Spray Tested Hardware
7-10days Working Days to Sample
Why Switch to Prefabricated Shower Pods?

Solve the "Slow, Costly, and Leaky" Construction Problem

A traditional bathroom ties up waterproofers, tilers, plumbers, and supervisors for 2–3 weeks per unit — and every grout line is a future leak risk. Industry data shows prefabricated pods cut bathroom installation time by 60–85% and remove the bathroom entirely from your project's critical path. Our prefabricated shower pods are engineered to deliver exactly that advantage, at factory-direct pricing.

1. Reduced On-Site Wet Work

Our pods integrate a pre-sloped SMC (Sheet Molding Compound) or reinforced acrylic tray with the back wall panels at the factory. The water-management structure is sealed and pressure-checked before it ever leaves our floor — no membrane painting, no curing windows, no weather delays on site.

2. Install in Hours, Not Days

Depending on layout and site conditions, a commercial shower pod can be positioned, leveled, and connected within 4–8 working hours by a two-person crew, versus 10–15 working days for a comparable tiled wet room. For a 200-room hotel, that schedule compression can translate into months of earlier occupancy revenue.

3. Predictable Budgeting & Quality

Every pod is manufactured and checked against an approved specification sheet before shipment. You replace the unpredictable variables of on-site labor — rework rates, wet-trade coordination, weather — with a fixed unit cost and a documented QC record per batch.

Top view of a corner shower enclosure with curved frosted glass panels, white frame and chrome handles
Anatomy of a Premium Shower Pod

What's Inside: Materials and Engineering, Layer by Layer

Our flagship MODEL D series is a "plug-and-play" prefabricated shower enclosure system — pre-drilled, pre-fitted, and pre-plumbed for rapid deployment. Here is exactly what your money buys:

  • The Base (Tray): High-strength SMC (Sheet Molding Compound) compression-molded base with a built-in 1.5–2% drainage slope and anti-slip textured surface. Load-rated for commercial traffic without flexing; optional reinforced acrylic trays for retail lines.
  • The Walls: Mold-resistant composite back panels in faux marble, subway tile, or matte solid finishes — the look of premium tile with zero grout lines to maintain or leak through.
  • The Enclosure: 8mm tempered safety glass (6mm optional for budget lines), compliant with EN12150 / ANSI Z97.1 / SGCC safety glazing standards. On impact, the glass fractures into small blunt granules instead of shards — documentation packs available for project approval.
  • The Frame: Anodized 6063-T5 aluminum profiles, corrosion-resistant and dimensionally stable, with wall-adjustment channels that absorb ±15mm of out-of-square site tolerance.
  • The Hardware: 304 stainless steel and solid brass rollers, hinges, and handles, verified through our 72-hour salt spray test before any batch ships.
  • The Fittings: Pre-installed valve bodies, showerheads, and shelving. Connections pre-drilled to NPT (US) or BSP (EU/UK) thread standards — your plumber only connects hot, cold, and drain.
White molded shower base with raised dot non-slip surface inside a white framed corner glass enclosure
Sealing, Testing & Compliance Data

The Numbers Behind "Leak-Resistant": Our Factory Test Protocol

Every buyer has heard "high quality." Fewer suppliers show the test data. Here is ours — the same protocol documented in our in-house lab and third-party inspection reports.

Test ItemStandard / MethodAcceptance CriteriaFrequency
Tempered glass fragmentationEN12150-1 / ANSI Z97.1≥40 particles in 50×50mm area, blunt granulesPer glass batch
Hardware corrosion72-hour neutral salt spray (NSS)No red rust, no blistering on 304 SS / brassPer hardware batch
Tray load & deflectionStatic load test, center pointNo cracking or permanent deformationPer mold batch
Water-tightnessFactory flood + spray test on assembled podNo leakage at joints after 30 minSampled per order
Packaging integrityISTA-style drop test (1 corner, 3 edges, 6 faces)Glass intact, EPE buffer functionalPer packaging design

Third-party pre-shipment inspection (SGS, Bureau Veritas, or your nominated agent) can be coordinated before container loading — we consider it part of a normal B2B order, not a special favor. Related reading: SGCC/CE certified shower glass, 72h salt spray testing, drop-test standards.

Specification Overview

Modular Shower Pod Specification Overview

Standard configurations below. All dimensions, finishes, and fitting brands are customizable for project and OEM orders.

SpecificationMODEL D (Flagship)Details
Overall sizes900×900 / 1000×800 / 1200×900 / 1500×900 mmCustom sizes on request
Height2100–2250 mmAdjustable to ceiling conditions
Glass8mm tempered (6mm optional)EN12150 / ANSI Z97.1 / SGCC compliant
Frame6063-T5 anodized aluminumChrome, matte black, brushed nickel, gunmetal
TraySMC compression-molded, pre-slopedAnti-slip texture; acrylic option
Wall panelsMold-resistant compositeFaux marble / subway tile / matte solid
Hardware304 stainless steel + brass72h salt spray tested
PlumbingPre-drilled, pre-fittedNPT or BSP threads; PEX/copper adaptable
Door typeSliding / pivotSoft-close rollers, durability cycle tested
PackagingFlat-pack knock-down kitEPE foam protection, drop-test verified
Container loadingProject-optimized stackingMaximized 40HQ loading plan per order
White rectangular low-profile shower tray with linear drain grate and raised rim, product photo on gray background
SMC compression-molded tray — pre-sloped, anti-slip, load-rated for commercial traffic.
Three Ways to Buy

Standard, Project, or Full OEM: Which Program Fits Your Order?

Different buyers need different levels of standardization. We run three supply programs so you only pay for the customization you actually need.

Standard Line

Retail / Small Batch

Best for
Retailers, e-commerce sellers, distributors testing the category
Sizes
Fixed catalog sizes
Finishes
3 standard finishes
Fittings
KJbath standard
MOQ
From 10 units
Sample lead time
7–10 working days
Docs provided
Manual, packing list
Branding
KJbath or neutral
OEM Line

Brand Owners

Best for
Brands building a private-label pod range
Sizes
Fully custom
Finishes
Custom colors, patterns, branding
Fittings
Buyer-specified / co-developed
MOQ
Negotiable by annual volume
Sample lead time
Prototype with design review
Docs provided
Full certification & compliance file
Branding
Your brand, your packaging
Quality Control Chain

From Incoming Glass to Loaded Container: One Traceable QC Chain

Pod quality fails at interfaces — glass to frame, tray to wall, valve to pipe. Our QC chain is built around exactly those interfaces:

  1. 01

    Incoming Inspection

    Glass thickness and temper certification verified per batch; aluminum profile wall thickness and anodizing checked against spec; hardware sampled for salt spray testing.

  2. 02

    In-Process Checks

    Tray slope and drainage verified after molding; frame cutting tolerance held to ±0.5mm; pre-drilled plumbing positions checked against the approved drawing — never guessed on the line.

  3. 03

    Assembly Verification

    Sampled pods fully assembled in our test bay for fit, door operation cycle, and water-tightness before batch release.

  4. 04

    Pre-Pack Review

    Accessories counted against the order BOM; labels coded by room/floor for project deliveries so installers grab the right kit for the right room.

  5. 05

    PSI & Loading Supervision

    Third-party inspection welcomed; container loading plans photographed and shared with the buyer before seal.

Rectangular corner glass shower enclosure with chrome frame, hinged door and white tray, lake view window background
OEM, Wholesale & Project Support Program

A Supply Partner for Your Brand, Not Just a Vendor

Whether you are a distributor adding bathroom pods for sale to your catalog or a brand building a private-label range, the engagement follows a fixed six-step path:

1

Layout & Code Review

Share your floor plans and target market. We confirm plumbing code (NPT/BSP), electrical pre-wiring options, and dimensional fit within 3 working days.

2

Mock-Up Pod

One production-grade sample built to your approved spec — 7–10 working days for standard configurations.

3

Spec & Finish Approval

Glass thickness, frame finish, panel pattern, and fitting brands locked in a signed specification sheet.

4

Batch Production

Scheduled production with in-process checkpoints and batch traceability.

5

Factory Testing & PSI

Water-tightness sampling, hardware test reports, and your nominated third-party inspection before loading.

6

Staged Container Delivery

Shipments phased to match your construction sequence — pods arrive when the floors are ready, not before.

Market signal: the prefabricated bathroom pods market is projected to grow from USD 6.1 billion in 2025 to USD 14.9 billion by 2035 (9.4% CAGR), driven by hotels, student housing, and healthcare construction. Buyers who lock in a qualified pod supply chain now are positioned ahead of that demand curve.

Installer fitting a black-framed recessed shower niche into large white wall tiles for a labor-saving bathroom installation
Project Evidence

Where Our Pods and Enclosure Systems Are Already Working

We do not publish client names without permission — but we can tell you what the projects looked like and what was delivered.

Modern resort villa at twilight with an illuminated swimming pool and warm interior lighting near Guangzhou
Australia · Multi-Unit Residential

Multi-Unit Residential Builder

Shower enclosure and screen systems supplied to a multi-unit residential builder, with tempered glass documentation (SGCC/EN12150) prepared for local compliance review and room-coded packaging to speed floor-by-floor installation.

View the Australia case
Resort suite with a freestanding white bathtub visible through glass walls beside an infinity pool at dusk
Canada · Hospitality Supply

Hospitality Buyer Program

Shower door and enclosure program for a hospitality buyer, with hardware finishes matched to the brand standard and 72-hour salt spray reports included in the compliance file.

View the Canada case
Rooftop infinity pool terrace at Panama Aquamare Hotel at dusk with wicker furniture and ocean view
Tanzania · Project Distribution

Container-Optimized Distribution

Container-optimized flat-pack shipment with loading plans shared pre-seal, cutting per-unit freight cost for the distributor.

View the Tanzania case

Ask us for the reference project closest to your region and building type — we will share the relevant spec pack and test documentation under NDA.

Installation & Lead Time

What Happens After the Container Arrives

  • On-Site Assembly: A two-person crew typically completes one pod in 4–8 working hours: position and level the tray, fix wall panels into the aluminum channels, hang the glass door, connect hot/cold/drain. No wet trades, no curing time.
  • Site Tolerance: Wall-adjustment profiles absorb ±15mm of out-of-square deviation — realistic tolerance for real construction sites.
  • Documentation: Every order ships with exploded-view assembly drawings, a step-by-step installation guide, and a video walkthrough for your crew's first unit.
  • Lead Time (typical): Sample/mock-up: 7–10 working days. Batch production: 25–35 days after spec approval, depending on volume and finish customization. Staged container delivery aligned to your construction schedule.
  • Freight Efficiency: Flat-pack knock-down design stacks trays, panels, and glass enclosures to maximize 40HQ loading — we share the loading plan and per-unit freight calculation with your quotation, so landed cost is transparent before you commit.
Close-up of frosted glass panels with white frame corner joint and chrome drain in a shower enclosure
FAQs

Frequently Asked Questions — by Buyer Role

Eight questions project teams ask before specifying modular shower pods — covering ROI, schedule, plumbing codes, site tolerance, freight, inspection, MOQ, and OEM branding.

What types of projects get the best ROI from modular shower pods?

For DevelopersRepetitive, large-scale layouts: student housing, multi-family apartments, hospitals, budget-to-midscale hotels, and workforce accommodation. Industry data shows pods cut bathroom installation time by 60–85%; a 200-room hotel finishing even two months early can recover far more than the typical 8–15% upfront premium over stick-built.

How do pods affect my project schedule and financing?

For DevelopersBathrooms come off the critical path. While your structure goes up, pods are built in our factory in parallel; installation compresses to hours per unit instead of weeks. Earlier completion means earlier occupancy revenue and lower financing carry.

Are plumbing connections compatible with US/European standards?

For Contractors & InstallersYes. We pre-drill and pre-fit pods to your regional codes — NPT threads for North America, BSP for Europe/UK/Middle East. Internal water lines are pressure-tested at the factory, and every order includes exploded-view drawings plus an installation video for your crew.

What if my walls are out of square?

For Contractors & InstallersOur 6063-T5 aluminum wall-adjustment channels absorb ±15mm of deviation. For anything beyond that, send us site measurements during the layout review step and we adjust the panel cutting plan before production — not on your site.

How do you ship these large units economically?

For Distributors & ImportersFlat-pack knock-down kits. Trays, back panels, and glass enclosures stack efficiently to maximize 40HQ loading; we share the loading plan and per-unit freight math with your quote. Packaging passes ISTA-style drop tests (1 corner, 3 edges, 6 faces) with EPE buffer protection around all glass.

Can I get third-party inspection before shipment?

For Distributors & ImportersAbsolutely — SGS, Bureau Veritas, or your nominated agent, coordinated before container loading. Batch test reports (glass fragmentation, 72h salt spray, water-tightness sampling) are part of the standard documentation pack.

What is the minimum order and how fast can I test the market?

For RetailersStandard Line starts from 10 units with 3 standard finishes, and samples ship in 7–10 working days. Many retail partners start with one mixed 20GP container to validate sell-through before committing to a private-label run.

Can I put my own brand, colors, and fittings on the pods?

For OEM Brand OwnersYes — the OEM Line covers custom sizes, finishes, buyer-specified fitting brands, branded packaging, and a full compliance file (SGCC/CE/EN12150 documentation, salt spray and water-tightness reports) under your brand name.

Contact

Plan Your Modular Shower Pod Project

Send us your floor plans, target market, and approximate unit count. Within 3 working days you will receive a layout review, a configuration recommendation, and a landed-cost estimate with container loading plan.

WhatsApp / WeChat

+86 13414990268

Address

No.1 Kexue Road, Zone B, Shishan Industrial Park, Nanhai, Foshan, Guangdong, China

    Send your project brief through the live CF7 form below. You can include dimensions, drawings, quantity targets, and any file references in one submission.

    Back to top
    Need a fast quotation? Chat with our export team on WhatsApp.